Religious

Wallingford Presbyterian Church

The Wallingford Presbyterian Church congregation is proud of its 120-year history while looking toward its meet future needs. The Collaborative provided the church with a master plan outlining recommendations for using existing space efficiently, addressing deferred maintenance of the stone arch between the nave and the chancel, making the church handicapped-accessible, and improving the circulation, landscaping, and stormwater management outside.

Volunteer Design Team

Eric Larsen

/
Structural Engineer
Larsen & Landis
|
Philadelphia, Pennsylvania

Evan Pappas

/
Electrical Engineer
Bruce E. Brooks & Associates
|
Philadelphia, Pennsylvania

Howard Lebold

/
Architect, Registered
McGillin Architecture, Inc.
|
Bala Cynwyd, Pennsylvania

Joseph Beyer

/
Other
Beyer Studio, Inc.
|
Philadelphia, Pennsylvania

Karla Wursthorn

/
Cost Estimator
T. N. Ward Company
|
Ardmore, Pennsylvania

Marta Mackiewicz

/
Architect, Intern
McGillin Architecture, Inc.
|
Bala Cynwyd, Pennsylvania

Nick Calcagni

/
Mechanical Engineer

"The project team collaboration, designers of all different strengths and weaknesses in helping each other to help the client."

Bruce E. Brooks & Associates
|
Philadelphia, Pennsylvania

Sean Metrick

/
Planner
Philadelphia, Pennsylvania

Suzanna Barucco

/
Preservationist

"'Design' may be something that not everybody fully understands, but the quality of our environment has an impact on all of us."

Philadelphia, Pennsylvania
Reflects volunteers' profession and firm at time of Design Grant
Project Title
Beneficiaries of the Past, Stewards of the Future:Conceptual Master Plan for Improvements
Address
110 E. Brookhaven Road
Wallingford, PA 19086
Neighborhood
Other
Volunteer Hours
395
Value of Pro Bono Services
$39,585
Design Grant Completed
March 23, 2012